Taking in account the porosity of the salt crust, volume of brine reserve is about 450 Mm3.
This brine contains of Na, K, Mg, Ca, and small amount of SO4 ions and no I and Br has
been detected.To produce yearly 50000 MT KCl from this brine, about 13 km2 solar ponds
are built which 1/3 of them are carnalite ponds and 2/3 are salt ponds.
Two pipelines with diameter of 70 cm are erected in order to transfer brine with maximum capacity of 4000 m3 in hour to the solar ponds.
Providing brine from different parts of the playa is done by means of seapage channels and several excavated wells.
Precipitation of salt and carnalite in the solar ponds will done in separate phases and will be controlled by growing density came from evaporation procedure. The final brine is sent out from carnalite ponds and is brought back to playa again. The salt and carnalite which are settled down in the ponds are transferred to plant after harvesting.
Part of the removed salt is washed at salt-washing plant with the capacity of 300000 annually.
All the process has been checked by pilot tests in pilot plants in site.
The main building of project is located in Khor city which contains offices, laboratories, and uesthouse.
The pilot plant, meteorology station and researching ponds are also there.
Also 6-mega watt electricity for revenue of manufacturing unites and pumping station is just installed as a power plant and this amount of electricity is now provided by 4 Diesel generators with capacity of 1.5-mega watt each one.
By putting in to operation the plant 400 persons directly and 1000 persons indirectly will work at this project, so these employment will create a great change in the area of Khor and Biabanak.